Last updated:
You typed a number, a unit and maybe a gym name, and you pressed the button. Then you read the confirmation properly. This page is for the hour after that. It explains how to cancel a Lift Ink order or change what is on it, how long you have, what happens to the money and what to do once the window has closed.
The window, in brief
- Cancel or change: within 24 hours of placing the order.
- How: email support@liftink.shop with the order number. We reply within 24 hours on business days.
- What can change: the typed text, the unit, the size, the colour, the item, the quantity and the delivery address.
- No proof is sent: we print exactly what was typed, so the confirmation email is the thing to read.
- Refund for a cancelled order: goes back to the original payment method.
- After the window: the 60-day return applies, to every item, personalised pieces included. Refund within 7 days of receiving the return.
How long do you have?
24 hours, counted from the time the order was placed. The time is on your order confirmation email. An order placed at 9:40 on a Tuesday evening can be cancelled or changed until 9:40 on Wednesday evening.
What counts is when your email is sent, not when we answer it. If you write to us at hour 23 on a Saturday, the request is inside the window even though our reply comes on the next business day. Send it as soon as you see the problem. A two-line email now beats a careful one tomorrow.
Why 24 hours and not longer? Each piece is printed to order, and making takes 1–3 business days. The window has to close before the print does. Nothing is emailed to you for approval in between, so there is no second checkpoint after this one.
Read the confirmation like a loaded bar
Before a heavy single you walk round the bar: plates matched on both sides, collars on, the right bar on the right hooks. Do the same with the confirmation email. It takes a minute.
| Line | What to look for | Common slip |
|---|---|---|
| Number | Every digit, and the decimal point if there is one | 142.5 typed as 1425; 405 typed as 450 |
| Unit | lb or kg | Kilo-plate lifter leaves the unit on lb |
| Lift name | Squat, Bench, Deadlift or Total | Deadlift number saved under Squat |
| Three lifts and total | Each of the three numbers; the total is their sum | One wrong lift makes the total wrong as well |
| Date line | Day, month and year in the order you meant | Today’s date in place of the day of the lift |
| Gym name | Spelling, capitals, spacing | “Ceder” for “Cedar”; a phone’s autocorrect |
| Est. year | Four digits | 2109 for 2019 |
| Size and colour | The size you wear in this kind of garment | XL chosen from habit when a 2XL was the plan |
| Mug size | 11 oz or 15 oz | The default left selected |
| Delivery address | Unit number, postal code, recipient name | An old address filled in by the browser |
How to ask for a cancellation or a change
- Open a new email to support@liftink.shop, from the address used at checkout if you can.
- Subject line: “Cancel” or “Change”, then the order number. For example: Change, order 1042.
- Body, for a change: quote the line as it stands now and the line as it should be. Old: 315 lb · Bench. New: 325 lb · Bench.
- Body, for a cancellation: say whether you want the whole order cancelled or one item in it.
- Send. We reply within 24 hours on business days and confirm in writing what was changed or cancelled.
Type the corrected text exactly as it should be printed: capitals, spaces and punctuation included. We will print the new line the way you write it in the email, as we did with the product page. If the correction itself has a typo, that typo is what gets printed. The Submit Ticket page has links that open your email app with a subject already filled in, if that is quicker.
A change is not done until you have our written reply. If a business day has gone by and you have heard nothing, look in spam, then write again and quote the first email.
Changes we can make inside the window
Changing a number after you order
You typed 315 and hit 325 two days later. Two days is outside the window, so that case is covered further down. But if the new PR lands the same evening, with the bar barely back in the rack and the order three hours old, write to us. Old number, new number, order number. The date line can be updated in the same email.
On the three-lift design, the total is the sum of the three numbers typed. If you correct one lift, say which one, and the total follows: “S 405 / B 275 / D 495 = 1175 lb total” with the bench corrected to 285 becomes a 1185 lb total. You do not need to do the addition for us, but it does no harm to write the total you expect so we can both see the same figure.
lb to kg, or the other way
Changing the unit changes the meaning of the print, so be explicit. “Change lb to kg, number stays 142.5” is clear. “Change to kilos” is not, because it leaves open whether the number should be converted. We do not convert numbers. We print the number and the unit you give us.
Fixing a gym name
Write the full name and the Est. year again, the way it should read: “Cedar Street Barbell · Est. 2019”. If two lifters share the garage and the same name is on a hoodie, a bottle and a duffle in one order, say that the correction applies to all three. If they were three separate orders, list all three order numbers.
Size, colour, item, quantity
Between XL and 2XL and you chose the wrong side of it: tell us the size you want. Adult apparel in 2XL–3XL is $2 more and 4XL–5XL is $4 more than the smaller sizes, so a size change can move the price a little in either direction. We set out any difference in our reply before anything further is charged or returned. The same goes for swapping a tee for a hoodie or adding a second mug. The Size Guide explains how to choose between two sizes if you are still deciding.
Delivery address
Send the complete corrected address, every line, not only the part that was wrong. We ship from the USA to the United States, Canada, Australia and New Zealand; the new address has to be in one of those four countries.
Cancelling outright
Inside 24 hours of placing the order you can cancel all of it or any one item in it. We confirm the cancellation by email. The refund goes back to the original payment method. For a part cancellation, the refund is the price paid for the cancelled item and the rest of the order goes ahead.
If you would prefer to hold the value for a different design, ask for store credit in the same email. Store credit never expires. A buyer who cancels a birthday tee because they have just learned the real bench number can either take the money back or bank the credit and reorder with the right figure.
The full account of how refunds are paid is on the Refund Policy page.
After 24 hours
Once the window has closed, the order is treated as in production and we do not promise that a change or a cancellation is still possible. You can still write. Tell us the order number and what is wrong, and we will tell you plainly where the order stands; contact us and we will sort it out as far as the stage of the order allows.
If the piece has already been made or sent, the route is a return. Every item can be returned within 60 days from delivery, personalised pieces included. For a change-of-mind return we pay the postage with a free return label by email, and the refund is made within 7 days of receiving the return. Wrong text typed by you and noticed too late falls under exactly the same rule as any other item. The procedure is on the Returns & Exchanges Policy page.
| Stage | Cancel | Change text, size or address | What to do |
|---|---|---|---|
| Within 24 hours of placing the order | Yes | Yes | Email us with the order number |
| After 24 hours, not yet shipped | Not promised | Not promised | Email us; we tell you where the order stands |
| Shipped, in transit | No | No | Wait for delivery, then use the 60-day return |
| Delivered | No | No | Return within 60 days from delivery |
The 315 that became 325
Back to the lifter from earlier. Order placed Monday with 315 on it. Wednesday, 325 goes up. The window closed on Tuesday. Three honest options. One: wear the 315. A PR goes up; the shirt records the day, and the date line says which day. Two: when the tee arrives, return it within 60 days and order the 325. Three: do nothing with the first tee and order a second, which is how some lifters end up with a drawer that reads like a training log.
The typo found the next morning
Ordered at 10 pm, read properly at 7 am. That is nine hours. You are well inside the window: email us the corrected gym name and it is fixed before printing. If the same typo is found three mornings later, it is a return once the piece arrives.
If we need to write to you first
We print what was typed, with one exception. A gym name that is a known gym chain, a brand, a federation, a team or someone else’s trademark is not printed. If your order carries a name like that, we email you to choose another. Reply with the new name and the order continues. Our reasons are set out in the Intellectual Property Policy.
Please reply from the address the order was placed with, and put the new name in the form it should be printed. Until we have a name we can print, that item waits. The 1–3 business days of making are counted from your reply for that item.
Small print, plainly
- One email per order is easiest to follow. If you placed two orders, name both numbers.
- A second change inside the window is fine. Each new email replaces the one before it, so restate the full line every time.
- We cannot take a change from a social media message or a phone call. Email is the only channel we run.
- We do not ask for proof of a lift. Change 405 to 415 and we print 415.
- Shipping is free before and after a change, to the same four countries.
Write to us about an order you just placed
Email support@liftink.shop. Order number and “Cancel” or “Change” in the subject. We reply within 24 hours on business days. Lift Ink, 202 Eucalyptus Hill Dr, Santa Barbara, CA 93101, US. Where the order goes next is on Order Tracking and Shipping & Delivery; other questions are answered in the FAQs.